Nicki and Stefan preparing for work ...
Arnold ready to shift tons of lead out of the lab.
Nicki mounting the cable channel for the magnet power supplies.
The bow saw now in continous action.
We added an automatic cooling / greasing system to make the sawing easy.
Lead waiting for processing.
Cable channel is ready.
Stefan looking quiet clever...
Dancing in the cave ...
The first layer of lead nearly completed.
Participants of the EPOS-Miniworkshop visting the ELBE hall. RKR explaining the neutron time-of-flight spectrometer.
RKR showing the cave 111b...
... and the positron converter.
Cave 111b
The positron lab still having almost no installation.
All the guys preparing for departure.
Marco full of enthusiasm after a hard day listing talks.
Tube arts ...
Stefan resting and ...
... being awaked by his mobile.
Converter chamber being removed to weld the leak.
Aluminum beam dump...
Beam line to the positron lab.
Converter chamber waiting for transport to the workshop.
Cave setup looks like 2 month before ;-(